# Old Jefferson Concrete Contractor for Sidewalk and Walkway Repair

> Sidewalk and walkway repair in Old Jefferson, a short drive from our St. George base. Root-lifted panels replaced, slopes set, a written estimate.

Canonical page: https://hernandezconcreteworks.com/old-jefferson

Hernandez Concrete Works (Hernandez Concrete Works LLC) is a family-owned concrete contractor based in Baton Rouge, LA 70817, owned by Gerardo Hernandez. Baton Rouge's family-owned concrete contractor for homeowners who want it done right beneath the surface: honest diagnosis, drainage-first prep, written estimates, and a job site left clean. Insured with general liability and workers' compensation. No foundation repair. Phone (225) 363-8576, Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed.

Hernandez Concrete Works is a concrete contractor in Old Jefferson, a few minutes from our base in the Shenandoah area of the City of St. George. If a root has pushed a sidewalk or front walk panel up into a trip edge, the fix is usually that panel, not the whole walk.

## Old Jefferson today: a St. George neighborhood on LA 73

Old Jefferson Highway, Louisiana Highway 73, has a junction listed in the community. It counted 7,339 people in the 2020 Census, up from 5,631 in 2000, and all of it falls in the 70817 ZIP code. Woodlawn High School and Woodlawn Elementary are both here, along with Most Blessed Sacrament Catholic School, and Blue Bayou Waterpark is a short drive away. Bayou Manchac, farther south, forms the southern border of the City of St. George.

Old Jefferson was a Census place until it became a neighborhood of St. George, so its permits now go through the city. The American Community Survey (2020 to 2024) puts the median home here at 1989, and about three in four are owner-occupied. If the walk to your front door is as old as the house, it may be due for a look.

## Sidewalk repair from a concrete contractor in Old Jefferson

Ask Gerardo what breaks sidewalks around here and he will answer in one word: roots. A walkway is thinner and lighter than a driveway, so a root growing under one panel lifts it easily, and the joint between that panel and the next one becomes a ledge someone will catch a toe on.

We do not grind, lift or level old slabs. Our repair is a replacement of the damaged panel: cut it out at the joints, deal with what pushed it up, prepare the base, and pour a new panel that sits flush with its neighbors and sheds water. If the root belongs to a tree you want to keep, talk to an arborist before anyone cuts it. If several panels in a row are cracked and tipped, Gerardo will tell you that a new walk is the honest answer and show you why.

> Most sidewalk damage is mainly roots. Usually it is one or two panels, and that is all we quote.

## Walkways and water near Tiger Bend and Hoo Shoo Too Road

The Advocate's August 14, 2016 report on extensive flooding near the Amite River named Old Jefferson and Shenandoah, from Tiger Bend down to Hoo Shoo Too Road. A front walk will not stop a flood, but on everyday rainy days it should never send water toward the house or leave a puddle at the door. When we replace a panel, we set its slope to match the walk's job, which is to carry water off to the lawn.

## Driveway permits on LA 73 and on St. George streets

Homes along Old Jefferson Highway front a state road, LA 73. A driveway that connects to a state highway falls under the Louisiana Department of Transportation and Development, which issues an Access Connection Permit for single-family homes (up to five homes on one connection). On a St. George city street, curb cuts and sidewalk removal in the public right-of-way go through the city's Department of Public Works, at 225-228-3200 or dpw@stgeorgela.gov. The city's permit terms require any damaged sidewalk, driveway, street or drainage feature to be repaired, and they rule out roadside work in front yards in wet conditions.

Before anyone digs, Louisiana law (R.S. 40:1749) requires a call to Louisiana 811 48 to 120 hours ahead, so buried lines get marked. Build that lead time into the schedule, and expect the written estimate to say who pulls any permit.

If a root has turned your Old Jefferson walkway into a trip hazard, call a concrete contractor Old Jefferson homeowners have a few minutes away. Call (225) 363-8576 or use the estimate form, and Gerardo will walk it with you and quote only the panels that need replacing.

## Services

- [Concrete Sidewalk Repair in Baton Rouge, LA](https://hernandezconcreteworks.com/concrete-construction/concrete-sidewalk-repair.md)
- [Concrete Sidewalk Construction and Walkways in Baton Rouge](https://hernandezconcreteworks.com/concrete-construction/concrete-sidewalks-and-walkways.md)
- [Concrete Driveway Repair in Baton Rouge, LA](https://hernandezconcreteworks.com/concrete-construction/concrete-driveway-repair.md)

## Local resources

- City of St. George: https://stgeorgela.gov/
- City of St. George building permits: https://stgeorgela.gov/departments/community-development/building-permits/
- LaDOTD residential access connection permit (state highways): https://dotd.la.gov/media/on2onpjs/1-access-connection-permit-residential-and-non-commercial-agriculture.pdf
- St. George Public Works right-of-way permit (curb cuts, sidewalks): https://stgeorgela.gov/wp-content/uploads/2026/05/2025_UTILITY-PERMIT_02.24.2026.pdf

## Frequently asked questions

### Can you replace just one raised sidewalk panel?

Yes. Sidewalk calls are usually about one or two panels a root has lifted, and if the rest of the walk is sound, that is all Gerardo will quote. The damaged panel is cut out at its joints and replaced with a new one poured flush with the panels on either side. We do not lift, grind or level old concrete; we replace the section that failed.

### Who handles concrete permits in Old Jefferson?

The City of St. George, for anything filed since October 16, 2024. Old Jefferson is a neighborhood of the city, so its residents no longer go to the parish for new permits. The city's Building Department is at 225-508-7920 and Permits@stgeorgela.gov. Its published list does not name walkway repairs specifically, so a short call before the work is the safe move.

### How far is Old Jefferson from your base?

A few minutes. We are based in the Shenandoah area, and both sit in the 70817 ZIP code inside the City of St. George. That makes Old Jefferson one of the closest places we serve, which helps when Gerardo needs to come back and look at a walkway after a hard rain.

### How soon can we walk on a new sidewalk panel?

Wait a full day, about 24 hours, before walking on it. Keep anything heavy, such as a loaded wheelbarrow, a trash cart full of yard debris or a vehicle, off it for 5 to 7 days. If the panel is the only path to your front door, tell us before the pour and we will plan the timing with you.

## Contact

- Hernandez Concrete Works, Baton Rouge, LA 70817
- Phone: (225) 363-8576
- Hours: Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed
- Free written estimate: https://hernandezconcreteworks.com/contact-us
