Skip to content
Hernandez Concrete Works
Crew tying a rebar grid across a large slab before the pour

City of Baker · East Baton Rouge Parish

Baker Concrete Contractor for Garage Slabs and Workshop Pads

Hernandez Concrete Works is a concrete contractor in Baker, LA, pouring the slab under a detached garage, a workshop or a storage building. Baker is its own city within East Baton Rouge Parish, and if your lot has room for a garage or workshop, the pad under that building has to carry vehicles, tools and workbenches for decades while staying out of the water.

Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed

01

Baker, from Cottonville to a city of its own

Baker started out as Cottonville and was renamed in 1888 for Josephus Smith Baker. Today it is an incorporated city with its own government and its own school system, the City of Baker School System, which runs Baker High School. Louisiana Highway 19 runs through the center of town and south about 5 miles to US 61 in north Baton Rouge, and LA 67 passes through the eastern part of the city. Baker Presbyterian Church on Groom Road dates to 1905, BREC's Baton Rouge Zoo is nearby, and the Baker Buffalo Festival is the city's own.

Baker counted 12,455 residents in the 2020 Census and an estimated 12,136 on July 1, 2025. Nearly all of it uses the 70714 ZIP code, with a small part in 70807. The American Community Survey (2020 to 2024) puts the median home's year built at 1979, so a driveway or garage floor poured with a house that age is well into middle age. Our base in St. George (70817) is about 21.1 driving miles away.

02

What goes into a garage or shop pad

A garage or shop slab is a working floor. Cars and trucks roll on and off it, jacks and tool chests sit on it, and in a workshop it may carry heavy machines in one spot for years. That calls for a well-prepared base, a slab poured to the building's exact footprint, and joints placed so any cracking follows a planned line instead of wandering across the floor. The door side needs special care: the floor should be just high enough that rain does not run in, with an apron that carries water away from the opening.

Most of the decisions that make a pad last are made before the truck arrives. Gerardo will go through them with you on site.

  • The building's footprint, door openings and anchor layout from the building plans.
  • Which vehicles and equipment will sit on the slab, and where.
  • Floor height compared with the yard, the driveway and the street.
  • Any plumbing or electrical lines that must be run under the slab before the pour.
  • How the new pad will connect to the existing driveway.
Finisher bull floating a driveway in front of a three-car garage under construction
Finisher bull floating a driveway in front of a three-car garage under construction.

03

Building above the water in Baker

Baker knows flooding better than most. The City of Baker Resiliency Plan (January 2018) reports that of the 5,601 housing units in the city, FEMA identified 3,601 homes that experienced flooding in 2016, about 64 percent. The plan places the flooded part of Baker in the White Bayou and Comite River sub-watershed of the Amite River watershed, and the Comite River gauge near Baker recorded a 3-day total of 21.18 inches in that storm.

For a garage or shop pad, that history shapes the layout. Before setting a floor height, find out your flood zone. The City of Baker Inspections Department provides flood zone determinations and culvert information to support proper drainage, and it is the right first call. Then the slab gets set and sloped so water runs away from the building and the house, not across the new floor. Our sister company, Hernandez Lawnscape, has spent years on drainage work in this area, and that experience goes into every pour.

04

Choosing a concrete contractor in Baker, LA for a shop pad

Most people collect two or three quotes for a slab like this. A lower bid usually saves money on labor, prep, or materials. We'll show you exactly where your money goes. Ask each contractor how the base is prepared, how the floor height was chosen, how water will leave the door side, and whether removal of any old concrete and haul-off are included.

Check registration too. Under Louisiana Licensing Board for Contractors rules, work on an existing home needs a home improvement registration once it passes $7,500, and a Residential license once it passes $50,000. We are insured, with general liability and workers' compensation, and every estimate comes in writing.

Walk-behind power trowel finishing a large concrete floor
Walk-behind power trowel finishing a large concrete floor.

05

After the pour

Stay off a new pad for a full day, and keep vehicles and heavy equipment off it for 5 to 7 days. The job is not done when the last of the concrete goes down. It is done when the forms come off, the debris is hauled away, and the property looks better than it did before we arrived. That is how Gerardo judges any contractor, including us.

Drone view of a fresh concrete front walk running from the street to the porch while the crew grades the yard
Graded lane between two homes with wood forms set along the edge, seen from the seat of the skid steer
Finished concrete walk running between a brick home and a fence to a black iron gate

If a garage or workshop is in your plans, start with a Baker concrete contractor you can talk to face to face. Call (225) 363-8576 or send the estimate form, and Gerardo will walk your Baker property, check the ground and the water, and give you a written estimate for the pad.

Baker questions

What Baker homeowners ask before the pour

Nearby areas we serve

Based in the Shenandoah area of St. George, Hernandez Concrete Works is a family-owned concrete contractor in Baton Rouge.

Do I need a permit for a garage or shop slab in Baker?

Ask the City of Baker Inspections Department before you build. Baker is its own city, so its inspections office, not the parish, is the place to start. We have not found a published Baker rule that covers a slab on its own, but the department provides flood zone determinations and culvert information, both of which matter when you are setting a building's floor height and drainage.

How did the 2016 flood affect Baker?

Badly. The City of Baker Resiliency Plan reports that FEMA identified 3,601 of the city's 5,601 housing units as having flooded, about 64 percent. The flooded area lies in the White Bayou and Comite River sub-watershed. That is why we treat floor height, slope and runoff as the first decisions on any Baker garage or shop pad, not afterthoughts.

Can you pour the slab for a metal garage kit?

Yes. We pour new slab foundations for metal buildings, garages and shops. Send the building package drawings before we quote, because the slab's size, door openings and anchor layout have to match the building, not the other way around. We pour the concrete; the building itself is set by the supplier or a builder you choose.

Which ZIP codes in the Baker area do you serve?

All of them. Baker is almost entirely in 70714, with a small part in 70807, and nearby White Hills shares the 70714 ZIP code. Our base in St. George (70817) is about 21.1 driving miles from Baker, and Gerardo comes out to walk the site himself before he writes your estimate.

How long before I can park in my new garage?

Plan on 5 to 7 days before driving on the new slab or moving heavy equipment onto it. You can walk on it after about 24 hours. Concrete keeps gaining strength well after it looks dry, and parking on it early is one of the quickest ways to crack a slab that was otherwise poured right.

Free written estimate

Concrete work in Baker? Let's look at it together.

Gerardo walks the property himself, explains what he sees, and puts a free written estimate in your hands before any work is scheduled.

Gerardo Hernandez walks every property himself.

Request a free estimate (225) 363-8576

Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed