Skip to content
Hernandez Concrete Works
Bull float smoothing a wide wet slab in dappled light

White Hills · Baker 70714 area

White Hills Concrete Contractor for Pole Barn Foundations

Hernandez Concrete Works is a concrete contractor serving White Hills, pouring the concrete side of a pole barn: the slab floor, the pad at the doors, and the planning that ties them to the posts. White Hills is a neighborhood in the Baker 70714 area, and if your property has room for one, a pole barn is a practical building for storing equipment, vehicles or a workshop under one roof.

Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed

01

Where White Hills is, and who issues permits

White Hills is a neighborhood name, not a city or a Census place, so there is no official population count for it. It shares Baker's 70714 ZIP code and mailing address, and its anchor is White Hills Elementary School at 5300 Bentley Drive, a K to 5 school in the East Baton Rouge Parish system. The Census geocoder places that address outside any incorporated city, which suggests White Hills sits in unincorporated East Baton Rouge Parish just beyond Baker city limits.

That matters for permits. In unincorporated East Baton Rouge Parish, permits come from the City of Baton Rouge and Parish of East Baton Rouge, filed through MGO Connect, and the parish lists any accessory structure over 200 square feet among residential jobs that require one. A 20 by 30 foot barn is already 600 square feet. If you are not sure which side of the Baker line your property falls on, ask the parish before you file. Our base in St. George (70817) is about 21 driving miles from White Hills Elementary.

02

Pole barn foundations from a concrete contractor in White Hills

A pole barn is framed on posts rather than on a continuous foundation wall, so the concrete question is a little different from a garage. In general, the posts are set first, and the floor slab is poured inside them afterward, or the building is planned with a slab and the posts are set to meet it. Either way, the floor has to be planned around the post layout from the building plans, with the slab edge, the door openings and any interior posts accounted for before the forms go in.

The floor should sit above the surrounding ground, with grade sloping away on every side, so water does not run in under the walls. Where equipment or a trailer will roll in, the door side needs an approach that does not trap water. Then give it time: a day before walking, 5 to 7 days before driving or loading heavy equipment onto it.

  • Bring the barn's drawings showing post spacing and door locations.
  • Decide what the floor will carry: a mower and tools, or a tractor and a loaded trailer.
  • Mark where water runs across the site in a heavy rain.
  • Confirm the permit before the pour.
Pump hose placing concrete over a rebar grid
Pump hose placing concrete over a rebar grid.

03

Rain on the north side of the parish

In the August 2016 storm, the Comite River gauge near Baker recorded a 3-day rain total of 21.18 inches, and Louisiana averages about 60 inches of rain a year in an ordinary one. We have not found flood figures for White Hills itself, so we will not quote any. What we can say is that a barn floor set at the right height, with the ground graded away from it, is the simplest protection a building gets against standing water. Years of drainage work through our sister company, Hernandez Lawnscape, are why we plan the water before the concrete.

Fresh concrete patio extending from the back doors of a cream-sided house toward the lawn
New concrete walkway running the length of a house beside the lawn and privacy fence
Broom-finished concrete walk between two brick columns leading toward a brick home's courtyard

If a pole barn is going up on your property, plan the floor with a White Hills concrete contractor you can reach in one call. Call (225) 363-8576 or send the estimate form, and Gerardo will walk your White Hills site and give you a written estimate built around your barn's drawings.

White Hills questions

What White Hills homeowners ask before the pour

Nearby areas we serve

Based in the Shenandoah area of St. George, Hernandez Concrete Works is a family-owned concrete contractor in Baton Rouge.

Is White Hills part of the City of Baker?

Not as far as the records show. White Hills shares Baker's 70714 ZIP code and mailing address, but the Census geocoder places White Hills Elementary at 5300 Bentley Drive outside any incorporated city, which points to unincorporated East Baton Rouge Parish. If you are unsure about your own lot, the parish permit office can confirm which jurisdiction you are in before you apply.

Do I need a permit for a pole barn in White Hills?

Most likely, yes. If your property is in unincorporated East Baton Rouge Parish, the City of Baton Rouge and Parish of East Baton Rouge lists any accessory structure over 200 square feet among residential jobs that require a permit, filed through MGO Connect. Even a modest 20 by 30 foot barn covers 600 square feet. Sort out the permit before the concrete is scheduled.

Do you build the pole barn itself?

No. We pour the concrete: the floor slab, the door approaches and any pads that go with the building. The barn is framed by the builder or kit supplier you choose. Share their drawings with us early, because the slab has to be planned around the post layout and the door openings, not guessed at after the posts are in.

How far is White Hills from your base?

About 21 driving miles from our base in St. George (70817) to White Hills Elementary, roughly a 37 minute drive without traffic. That is well within our service area, and Gerardo makes the trip himself to walk the site before he puts a written estimate together.

Free written estimate

Concrete work in White Hills? Let's look at it together.

Gerardo walks the property himself, explains what he sees, and puts a free written estimate in your hands before any work is scheduled.

Gerardo Hernandez walks every property himself.

Request a free estimate (225) 363-8576

Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed