Equipment pads
Level Concrete Equipment Pads That Keep Your Equipment Out of the Water
Concrete equipment pads give an air conditioner, a standby generator or a pool pump a level, solid base that stays put and stays above the puddles. Hernandez Concrete Works pours equipment pads across the Baton Rouge area, including generator pad work in Baton Rouge for homeowners who learned the hard way what a long outage feels like. The pad is small, but if it settles, tilts or sits in water, the expensive machine on top of it pays for it.
Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed
01
Why concrete equipment pads fail, and why it matters
Equipment pads usually fail in one of three ways. The ground under them settles and the pad tilts. Roots or soil movement push one edge up. Or the pad was set at yard level in a spot that holds water, so every heavy rain leaves the unit standing in a puddle.
A tilted pad is not just ugly. Equipment that is meant to sit level can run poorly, drain wrong or put strain on the lines connected to it. A pad that sits in water exposes the bottom of the unit to moisture it was never meant to sit in. Either way, the fix is the same: a pad that is level, on a compacted base, and set at the right height for the spot.
02
Generator pad in Baton Rouge: planning around the outage
A standby generator only earns its price when the power is out, and around here the power tends to go out during the same storms that flood yards. A generator concrete pad that sits low can leave the unit in water at exactly the moment you need it running.
That is why we pay close attention to height and drainage on generator pads. We look at where water collects on your lot, how the ground falls, and how the pad sits relative to the house. The pad is formed level and set so rain sheds off it and away.
Location and clearances for a generator come from the manufacturer and your installer or electrician, not from us. Get their layout before the pour, and we will form the pad to their dimensions and spot. Getting that order right avoids pouring a pad in the wrong place.
03
HVAC pad and ac pad replacement
Many AC condensers in older neighborhoods sit on a small pad that was set decades ago and has since sunk, cracked or tipped toward the house. When the unit leans, it is time to look at the pad, and often the soil under it.
Tree roots are a common culprit. Roots lifting one section is something Gerardo sees all the time on sidewalks and driveways near trees, and a small pad near a big tree can be pushed up on one side the same way. Sometimes the best fix is moving the new pad a few feet, if your HVAC company can route the lines.
For an ac pad replacement, the unit has to be disconnected and moved by your HVAC company so the old pad can come out. We then prepare the base, form a new HVAC pad level and at a sensible height, and let your HVAC company set the unit back once the concrete is ready. If you are already replacing the system, that is the best time to replace the pad too, since the old unit is coming off anyway.
04
Pool equipment pad
Pumps, filters and heaters usually sit together on one pad, often in a back corner of the yard where the ground is lowest. A pool equipment pad needs room for everything the pool company plans to put on it, with space to reach each piece for service.
Ask your pool company for the equipment layout and size before we form it. A pad that is a little too small means equipment hanging off the edge or crammed together, which makes every future repair harder.
05
Height and water: what the 2016 flood taught this area
The August 2016 flood damaged about 41,000 housing units in East Baton Rouge and about 74 percent of the housing stock in Livingston Parish. Watson recorded 31.39 inches of rain from that one storm. Louisiana averages about 60 inches of rain a year, and plenty of storms that never make the news still leave yards underwater for a day.
No equipment pad can protect a unit from a flood like 2016. What a well-set pad can do is keep equipment above the everyday standing water that collects after a hard rain, and keep it level so the ground under it does not wash out. The Hernandez name has been doing drainage work on Baton Rouge area properties since 2013 through Hernandez Lawnscape, and we look at the runoff around every pad the same way.
06
What affects the cost of an equipment pad
Equipment pads are small jobs, and small jobs are priced mostly by the work around the concrete, not the concrete itself. The pad's size and height, whether an old pad has to be broken out and hauled away, how much base the soil needs, how far the concrete has to travel from the truck to the back of the yard, and whether your equipment company has to move a unit all change the number.
Sometimes it makes sense to pour an equipment pad on the same visit as another job, such as a walkway to the generator or a patio extension. Ask about it on the site walk. Gerardo may give a rough range on the phone, but the written estimate is what to compare.
07
Questions to ask about any equipment pad bid
Some equipment pads are poured by the installer's crew, some come as precast or plastic pads, and some are poured by a concrete contractor like us. Any of those can be fine. What matters is whether the base under it is prepared, whether it is level, and whether it sits at the right height for that spot in your yard.
Most homeowners get two or three quotes, and a small job is no exception. When you compare them, ask everyone the same few questions and see whose answers are specific.
- How will the ground under the pad be prepared and compacted?
- How high will the pad sit above the surrounding yard, and why?
- Which way will water run off it?
- Is removing and hauling away the old pad included?
- Who coordinates with the installer on size, spot and timing?
08
Working with your installer
Most equipment pads involve two trades: us for the concrete and an HVAC, generator or pool company for the equipment. The jobs go smoothly when the installer's layout reaches us before the pour and the unit goes back only after the pad has had its time. Wait a full day, 24 hours, before walking on new concrete, and 5 to 7 days before putting anything heavy on it.
We are insured, with general liability and workers' compensation, and we clean up after ourselves: forms pulled, leftover concrete and debris hauled off, and the yard around the pad left better than we found it.
Concrete equipment pads are some of the smallest jobs we pour, and we treat them like they matter, because the equipment on top does. For a generator pad in Baton Rouge, an HVAC pad, an AC pad replacement or a pool equipment pad, call (225) 363-8576. Gerardo will look at the spot, the water and your installer's layout, and send a written estimate. For the basics that apply to every new pour, see our concrete slab foundation page.
Sources and local resources
How the job runs
From the walk‑through to a clean site.
Every job starts with Gerardo on the property and ends when the forms are pulled, the debris is hauled off and the site looks better than it did before the crew arrived.
01
Get the layout
Your installer gives us the pad size and spot for the unit.
02
Site walk
Gerardo checks the ground, the low spots and how water leaves the area.
03
Base, form and pour
The base is compacted, the pad is formed level at the right height, then poured and finished.
04
Cure, then set
After the cure window, your installer sets the equipment on the new pad.
Straight answers
Questions about equipment pads
How big should a generator pad be?
The size comes from the generator manufacturer and your installer, who also set the clearances from the house, windows and other equipment. We do not set those numbers ourselves. Get the layout from your installer or electrician before the pour, and we will form the generator concrete pad to their dimensions, level and at a height that keeps it out of standing water.
How long before the equipment can go on a new pad?
Wait a full day, 24 hours, before walking on the pad, and 5 to 7 days before setting anything heavy on it. Concrete keeps gaining strength through that first week. Coordinate with your HVAC, generator or pool company so they set the unit after the pad has had its time.
My AC unit is leaning. Do I need a new pad?
Usually, if the pad has sunk or tipped, the pad and the ground under it are the problem, not the unit. Your HVAC company disconnects and moves the condenser, we remove the old pad, prepare the base and pour a new level one, and the HVAC company resets the unit after the concrete cures. If you are replacing the system soon, do both at once.
How high should an equipment pad sit?
High enough to stay out of the standing water that collects on your lot after a hard rain, and set so water runs off and away. The right height depends on where the low spots are, so we look at the drainage on the site walk. No pad can protect equipment from a major flood, but it can keep it out of everyday puddles.
Can you pour a pad for pool equipment?
Yes. Get the equipment layout from your pool company first so the pad fits the pump, filter, heater and anything else, with room to reach each piece for service. Pool equipment often sits in a low corner of the yard, so height and drainage get the same attention as on a generator pad.
Do you install generators or HVAC units?
No. We pour the concrete pad only. The equipment is installed, connected and set by your HVAC, generator or pool company. We work to their layout and timing so the unit goes onto a level pad in the right spot.
Keep reading
Related concrete work
Free written estimate
Tell us what is cracked, lifted or missing. We'll tell you straight.
Tell us what you are seeing with your equipment pads. Gerardo walks the property himself and puts a free written estimate in your hands.
Gerardo Hernandez walks every property himself.
Request a free estimate (225) 363-8576Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed