Skip to content
Hernandez Concrete Works
Finisher bull floating a driveway in front of a three-car garage under construction

Garage and shop pads

Concrete Garage and Shop Pads for the Building You've Been Planning

Garage and shop pads are the floor under a detached garage or workshop, and they are the one part of the building you cannot fix later without tearing it out. Hernandez Concrete Works pours concrete shop pads in Baton Rouge, Central and across Livingston Parish for property owners adding a shop, a second garage or a work building on a bigger lot. We plan the pad around what you will do in the building, where the water goes outside it, and the permit and flood rules where you live.

Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed

01

Who calls us about garage and shop pads

A lot of these calls come from the growing side of the region. Livingston Parish was Louisiana's fastest-growing parish from 2020 to 2025, up about 9 percent, and people moving to Denham Springs, Walker and Watson often pick a bigger lot because they want room for a shop. Central and the north end of East Baton Rouge Parish see the same thing.

The plan usually looks like this: the house is done, the family has settled in, and now there is a boat, a side business, a woodworking hobby or a second vehicle that needs a roof. The building may be a kit, a builder's stick-frame garage or a steel shop. Whatever goes on top, it needs a concrete pad for the shop that is flat, solid and dry.

We are a family business too. The Hernandez name has served Baton Rouge area properties since 2013 through Hernandez Lawnscape, and Concrete Works is the family's dedicated concrete company, launched in 2026. When you call about a shop pad, Gerardo is the one who comes out to walk the lot.

02

Plan the workshop slab around the work

Before anyone talks about size, Gerardo asks what you will do inside. A garage floor slab that only parks two cars is a different job from a workshop slab that will hold a vehicle lift, a welding table, an engine hoist or a loaded trailer. Heavy, concentrated loads call for more thickness and reinforcement where they sit, and it is far easier to plan that now than to cut the floor later.

We also ask where the doors go and how you will drive in. The floor is usually set to drain gently toward the big door so a wet truck or a hose-down runs out instead of pooling in the middle. If the building will have plumbing or electrical running under the slab, those lines need to be roughed in by your plumber or electrician before the pour. We schedule around them.

  • What will sit on the floor: vehicles, lifts, tool chests, a boat on its trailer
  • Where the overhead door and walk-in door go
  • Which way the floor should fall for washing out
  • Any lines that have to go under the slab before the pour
  • An apron outside the door so you are not driving off concrete into mud

03

Detached garage slab: getting the height right on low ground

Height is the decision that matters most on a lot that holds water. The August 2016 flood damaged about 74 percent of Livingston Parish's housing stock, and Watson recorded 31.39 inches of rain from that storm. Anyone building on low ground here has to think about where the floor sits relative to the yard and the street.

Local rules come into it too. The City of Walker, for example, says fill may not be placed on any property in a special flood hazard area except under specific circumstances. So raising a pad is not always as simple as bringing in more dirt. Check your flood zone and the local rules before the design is set, and we will build the pad and the grading around what your permit allows.

Outside the slab, the ground should fall away on every side. Water that runs toward a detached garage ends up under the door and along the bottom of the walls.

Walk-behind power trowel finishing a large concrete floor
Walk-behind power trowel finishing a large concrete floor.

04

Permits and inspections for a concrete shop pad

Permit rules depend on where your lot is. Livingston Parish's permit department handles new residential construction in the unincorporated parish, and its inspection sequence includes a foundation inspection. Walker requires building permits for all structures, and Denham Springs and Central have their own offices. In East Baton Rouge Parish, any accessory structure over 200 square feet is on the list of residential work that needs a permit.

The building permit usually belongs to whoever is putting up the building, and the slab has to match those plans. If your garage or shop has drawings, give us a copy; we pour to what is on them.

05

The apron, the approach and the rest of the lot

A shop on a bigger lot is often set back from the house, and the path between them gets used more than people expect. Trucks, trailers and mowers will cross that ground every week. If the only concrete is the floor inside the walls, the area in front of the door turns into ruts and mud by the first wet winter.

That is why we talk about an apron at the big door, and sometimes a strip or approach connecting the shop to the driveway. They can be poured at the same time as the pad or later. Pouring them together usually means one mobilization, one set of forms and one cleanup, but there is no wrong answer if the budget says the floor comes first.

When we are done, the job is not finished until the forms are pulled, the excess concrete and debris are hauled off, and the lot looks better than it did before. On a bigger property with a long haul back to the truck, that cleanup takes real time, and it belongs in the estimate.

Crew tying a rebar grid across a large slab before the pour
Crew tying a rebar grid across a large slab before the pour.

06

What changes the price of a shop pad

We don't put prices on this page because shop pads vary more than almost anything we pour. A small garage pad on high, firm ground and a large shop floor on a low lot that needs fill are not in the same range. The main cost drivers are size, thickness and reinforcement for the loads, how much fill and compaction the site needs, drainage around the building, access for the truck, and any apron or approach outside the door.

Homeowners' biggest unknown is usually price. Some are pricing a shop for someday, some have the right number in mind, and some are surprised. Either way, a written estimate with the scope spelled out is the only fair way to compare.

Concrete pouring from a mixer chute while a finisher floats the slab
Concrete pouring from a mixer chute while a finisher floats the slab.

07

How to compare bids on garage and shop pads

Ask each contractor the same questions and write down the answers: How will you prepare and compact the base? How thick is the slab under the lift or the trailer? Which way does the floor fall? Who sets the height, and is it based on the flood zone? Is haul-off included? If one bid is much lower, it is usually saving on overhead, labor and profit, a little of everything, and it is worth asking what was left out.

We are insured, with general liability and workers' compensation. Gerardo's own standard for hiring anyone is simple: make sure they know what they're doing, be there on time, and pay attention to all the details. Hold us to it.

The pond-side patio seen from the back yard: new concrete under the covered porch, framed by brick half-walls
Old concrete broken out of a side yard between two brick homes, with new forms set along the edge
Drone view of a new concrete walkway running from the street to a home's front porch, the yard graded on both sides

If you are adding a shop or a second garage, start with the floor. Call (225) 363-8576 about garage and shop pads in Denham Springs, Walker, Watson, Central or Baton Rouge, and Gerardo will walk the lot with you and put a written estimate in your hands. Our name is on every pour. For the basics that apply to every new pour, see our concrete slab foundation page. We pour shop and garage pads in Baker and nearby.

How the job runs

From the walk‑through to a clean site.

Every job starts with Gerardo on the property and ends when the forms are pulled, the debris is hauled off and the site looks better than it did before the crew arrived.

  1. 01

    Walk the lot

    Gerardo looks at the building spot, the low ground, the approach and what will go inside.

  2. 02

    Match the plans

    We review the building drawings or your layout, the floor height and where the doors go.

  3. 03

    Prepare the pad

    Soft soil comes out, base goes in and is compacted, and forms are set to the planned slope.

  4. 04

    Pour and finish

    Reinforcement goes where the loads are, then the slab is poured, jointed and broom-finished.

  5. 05

    Clean up and cure

    Forms come off, debris is hauled away, and the pad gets 5 to 7 days before heavy loads.

Straight answers

Questions about garage and shop pads

How soon can the garage or shop go up on a new pad?

Wait at least 24 hours before walking on the slab and 5 to 7 days before driving on it or setting anything heavy on it. Framing crews and building erectors may want their own window on top of that, so ask them when they want to start. Plan your delivery date after the pour, not before it.

Can you pour a pad for a vehicle lift?

Yes, but tell us before the pour. A lift puts heavy loads on small areas, and the slab under the posts needs more thickness and reinforcement than the rest of the floor. Lift makers usually publish their own concrete requirements, so bring those to the site walk and we will build the pad to them.

Do I need a permit for a detached garage or shop?

In most places, yes. East Baton Rouge Parish lists any accessory structure over 200 square feet among residential work needing a permit, Walker requires building permits for all structures, and Livingston Parish inspects foundations as part of its sequence. Check with the permit office for your address before the pour.

Should the garage floor slope?

Usually, yes, a gentle fall toward the main door so water from a wet vehicle or a hose-down runs out instead of pooling. The amount is small enough that you will not notice it walking across the floor. If you plan a floor drain instead, have your plumber rough it in before the pour and we will slope the floor toward it.

Can you raise the pad above the yard to stay dry?

Often, yes, but how high and how much fill you can use depend on your flood zone and local rules. Walker, for example, restricts placing fill in a special flood hazard area. Find out your flood zone first, and we will set the pad and the grading around it so water runs away from the building.

Do you build the garage or shop?

No. We pour the concrete pad and any apron or approach; the building itself is put up by your builder, kit supplier or erector. We are glad to coordinate with them on the plans, the floor height and the timing so the building lands on a slab that matches it.

Free written estimate

Tell us what is cracked, lifted or missing. We'll tell you straight.

Tell us what you are seeing with your garage and shop pads. Gerardo walks the property himself and puts a free written estimate in your hands.

Gerardo Hernandez walks every property himself.

Request a free estimate (225) 363-8576

Mon to Fri 8am to 6pm, Sat 9am to 1pm, Sun closed